Later in 1996, Ameristar Casinos planned to purchase Gem Gaming, and construction slowed to allow for an expanded redesign of the project, which was then expected to open between March and April 1997. Steve Rebeil and Dominic Magliarditi, both of Gem Gaming, were the project developers. Construction began later in 1995, and the project was topped off in May 1996, with an opening scheduled for October 1. Gem Gaming announced the project in 1995, as The Reserve, with an opening planned for July 4, 1996.